Crips CAD Stages of Design Pre Design Stage □ Life Style discussion. □ Establish the client's management committee. □ Appoint client's project representative. □ Compile the first stage brief. □ Establish the allowable budget for the construction through to completion. □ Appoint the principal consultant (Building Designer) who will lead the consultancy team and be responsible to the client's project representative and to the client. □ Appoint the cost consultant (usually the quantity surveyor), and other selected specialist consultants. □ Sign off on brief. Design Stage Conceptual Design Stage / Design Development Stage □ Site Visit. □ Deposit for planning required . □ Soil Reports drafted. □ Footings engineering □ Drafting work on plans Documentation Stage □ Review of drafting designs □ Planning Approval □ Engineering □ Building Approval □ Total council approval □ Selections
Tender Stage □ Tenders secured.
Contract Stage □ Initial works contract.
Construction Stage □ Block cleared. □ Sewer & drainage. □ Slab poured. □ 1st fix frames. □ Roof trusses. □ Roof on. □ Brick work. □ Hot & cold. □ Lock Up. □ Electrical. □ Gyprock. □ Wet Areas. □ Tiling. □ Cupboards. □ 2nd Fix. □ Painting. □ Stick Down. □ Cleaning. □ Hand over.
Defects Liability Period Post Occupancy Evaluation □ Close of file.
|
[Home] [Contact Us] [2D Plans] [3D Renders] [Portfolio] [Services] |